A machine produces 240 bolts in 25 minutes. At the same rate how many bolts would be produced in 45 minutes
I believe the answer is C
ASA
Angle-Side-Angle
AAS is the same but the order in different.
SAS is a no because there are no two S.
Can't determine bah! You can determine.
PLEASE BRAINLIEST