Answer:
-19/4
Step-by-step explanation:
-1/2 + x =-21/4
x=-21/4+1/2
x=-21/4+2/4
x=-19/4
The estimate, 4 × 5 = 20, helps me
know that the decimal point should be placed so that the answer is close to 20.
15 + 20p = c ( this is the answer )
fifteen plus twenty times the number of parts equals the total cost.
Answer:
The 99% confidence interval for the proportion of ASD in Arizona is (0.014, 0.018).
Step-by-step explanation:
The information provided is as follows:

The sample proportion is:

The critical value of <em>z</em> for 99% confidence level is, <em>z</em> = 2.56.
Compute the 99% confidence interval for the proportion of ASD in Arizona as follows:


Thus, the 99% confidence interval for the proportion of ASD in Arizona is (0.014, 0.018).
First of all, i will start by comparing the given values. That will be;
7/2 meters=$231/4
1 meter= x
I represented the unknown value by x. Anyway, you have to cross and multiply. SO 7/2 multiplies x to give you 7/2x and 1 multiplies 231/4 to give you 231/4. That will be;
7/2x=231/4
Divide the both sides by 7/2.
7/2x÷7/2=231/4÷7/2
When dividing fractions, the division sign changes to a multiplication sign and the fraction on the right turns upside down. So;
x=231/4 x 2/7
x=231/14
x=$33/2.
Hope i helped.