Common factors include: 5 and 1
I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Y=1/3x+2
(-6,0)
(0,2)
(6,4)
Answer: He needs 9 hours to finish the task.
Step-by-step explanation:
Hi, first we have to subtract the gallons of water already in the tank (75) to the total capacity of the tank (300).
300-75 = 225
He needs to fill 225 gallons.
Since the pump Ross uses can fill 25 gallons of water per hour, the proportion is :
25 g / 1h
For 225 gallons:
225 g / x hours
Solving for x
25/1 = 225/x
x= 225/ (25/1)
x = 9 hours
<span>forth to the sun is 1 light-year</span>