I can't read number 15, but number 16 is C
This question is about compound interest, but since the interest is such a small number you can use what you know about simple interest to eliminate some answers.
You can immediately eliminate choice A as a clunker, since it is less than the original amount in the account.
Consider what the amount of interest would be if you make the rate much larger than the original rate, say 10%, or 0.1:
$6,500 × 0.1 = $650
If this amount were added to the original amount each year for two years, the total would be:
$6,500 + $650 + $650 = $6,500 + $1,300 = $7,800
This is an over-estimate for the information given, and since choices C and D are even greater than this over-estimate, they can be eliminated. That means choice B is the correct answer.
Answer:

Step-by-step explanation:
To find the equation, use the slope-intercept formula:

m is the slope and b is the y-intercept. Now, it'll really help to draw a line through the points, connecting them. If you look at point (0,2), we can see that this is the y-intercept (where a point sits on the y-axis when x=0). You can insert this into the equation by taking the y value:

Now, take any two points to find the slope. To make it easier, I'll use (1,5) and (0,2). Use the slope formula for when you know two points:

Rise over run is the change in the y-axis over the change in the x-axis. Insert values:

Solve:

Since both are negative, the result is a positive:

Insert this into the equation as m, the slope:

Done.
Number of sides= 10
Side length= 4.6 ( or in this case base)
161 sq inches / 10 = 16.1 area of triangle.
Area of triangle =(b<span>ase * </span>height)/2
16.1=(4.6*h)/2
multiply 16.1 by 2 (cancels the dividing the 2)
32.2=4.6*h
divid 32.2 by 4.6
<span>7 is the height of the triangle</span>
What is the base salary for the Bit Labs?
Hours of training Monthly salary
10 1250
20 1400
30 1550
40 1700
50 1850
60 2000
70 2150