Answer:
Don't accept A-G
Accept only A-E
Step-by-step explanation:
The company would those projects with a return of return equal to or higher than its cost of capital of 10.45%
Project A with a 12% return is acceptable.
Project B with a 11.5% rate of return is also acceptable
Project C has a rate of return of 11.2% , hence acceptable.
Project D has 11% rate of return and it is therefore acceptable.
Project E has 10.7% return rate and it is acceptable.
Project F has a lower rate of return of 10.3%, hence rejected, as well as projects G
Answer: 15, -8
Step-by-step explanation:


Answer:
see explanation
Step-by-step explanation:
The area (A) of a regular decagon ( 10 sided ) is calculated as
A = 0.5 × perimeter × apothem
Here side length = 3.25, hence perimeter = 10 × 3.25 = 32.5 m, thus
A = 0.5 × 32.5 × 5 = 81.25 m²
Answer:
Step-by-step explanation:
Remember the entire circle has 360 degree. You have everything you need to find angle b.
Your total circle at 360, the measurement 300 and 37.
Answer:
C
Step-by-step explanation: