Answer:
The farmer should plant 14 additional trees, for maximum yield.
Step-by-step explanation:
Given
So, we have:
Required
The additional trees to be planted for maximum yield
The function is:
Open bracket
Rewrite as:
Differentiate
Equate to 0 and solve for x to get the maximum of x
Divide by -4
The farmer should plant 14 additional trees, for maximum yield.
Answer:
the equation of a straight line in the form y = mx + b where m is the slope of the line and b is its y-intercept.
Step-by-step explanation:
Answer as an improper fraction = 13/8
This is equivalent to the mixed number 1 & 5/8
In decimal form, 13/8 = 1.625
=========================================
Work Shown:
3/4 = (3/4)*(2/2)
3/4 = (3*2)/(4*2)
3/4 = 6/8
----------
7/8 + 3/4
7/8 + 6/8
(7+6)/8
13/8
So 7/8 + 3/4 = 13/8
true
Typically, the price charged must cover more than labor costs figured at an hourly rate. There may be costs related to rent, utilities, administration, equipment use and/or depreciation. These costs are often called overhead<span>.</span>
Answer:hexagon square
Step-by-step explanation: