Answer:
n=10
a10= - 3 (2)^(10-1)= -3(2)^9
= -1536
The correct answer would be B. Sexual reproduction does infact create more variation in plants.
Answer: The answer is A
Step-by-step explanation:
The given complex number is ⇒ z = a + b i
The absolute value of z = √( a² + b² ) = 3.28
So, we will check which of the options will give 3.28
<span>( A) IF ⇒⇒ a=1.5 and b=1.7
</span>
<span>∴ √( a² + b² ) = √( 1.5² + 1.7²) = √5.14 ≈ 2.27
</span>
===================================
<span>(B) IF ⇒⇒ a=1.5 and b=3.3
</span>
<span>∴ √( a² + b² ) = √(1.5² + 3.3²) = √13.14 ≈ 3.62
</span>
====================================
<span>(C) IF ⇒⇒ a=1.7 and b=2.8
</span>
<span>∴ √( a² + b² ) = √(1.7² + 2.8²) = √10.73 ≈ 3.28
</span>
====================================
<span>(D) IF ⇒⇒ a=2.8 and b=3.3
</span>
∴ √( a² + b² ) = √(2.8² + 3.3²) = √18.73 ≈ 4.33
=====================================
So, the correct answer is option (C) <span>a=1.7,b=2.8</span>
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1