Answer:
0.7486 = 74.86% observations would be less than 5.79
Step-by-step explanation:
I suppose there was a small typing mistake, so i am going to use the distribution as N (5.43,0.54)
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
The general format of the normal distribution is:
N(mean, standard deviation)
Which means that:

What proportion of observations would be less than 5.79?
This is the pvalue of Z when X = 5.79. So



has a pvalue of 0.7486
0.7486 = 74.86% observations would be less than 5.79
2 to the power of 14 means 2^14.
That would be 16384.
You can make an equation with this information using a variable for the number of days and solve for that variable. Here we can use d to represent days.
Ryan can build 4 desks in a day, so you could express his production as 4d.
Larry can build 4 desks in 2 days, so you could say he makes 2 desks in 1 day, expressed as 2d.
If Larry starts work one day before Ryan, he's made an extra 2 desks. To get 32 desks, you need to add together those 2 desks Larry made, however many desks Larry can make, and however many desks Ryan can make:
2 + 4d + 2d = 32.
Then just simplify and solve:
6d = 30
d = 5.
It'll take 5 days for them to make 32 desks. Hope this helps! Please rate this answer as brainliest if you liked it!! thank you!!!