Answer:
c. $100,000
Step-by-step explanation:
Calculation of the expected net profit of Ephemeral services corporation
Since we are been told that 9 other companies besides esco are as well bidding for the $900,000 government contract, it means we have to find the expected net profit by dividing 1 by 9×$900,000 .Thus ESCO can only expect to cover its sunk cost.
Hence ,
E(X) = (1/9) × $900,000
E(X)=0.111111111×$900,000
E(X)= $100,000
Therefore the expected net profit would be $100,000
Answer:
i would say b
Step-by-step explanation: if they all slept 4 hours a night then all 9 would have a total of 36 and a night would be 1 so 36 to 1
Absolute value is simply the distance from zero on a number line. -44 is 44 away from zero, so the absolute value of -44 is
44
<h3>
Answer: 100 meters</h3>
===========================================
Explanation:
If you draw out the diagram, then you'll find that a 45-45-90 triangle forms. The nice thing about this type of triangle is that the two legs are always the same length. The horizontal leg is 100 meters, so the vertical leg must also be 100 meters.
Side note: this type of triangle is an isosceles right triangle.
---------
You could use the tangent rule to get the same thing
tan(angle) = opposite/adjacent
tan(45) = 100/x
1 = 100/x
1*x = 100
x = 100
In this case, the opposite leg is the vertical leg since it is furthest from the angle of elevation.
Answer:
Hey! Sorry im too late lol but here-
Step-by-step explanation:
Example of tangent in the real world-
When a stone gets tied at one end of a string & the other end is rotated, then the stone will form a circle.
How you know the tangent and radius are perpendicular:
The radius is formed vertically and is completely straight, while the tangent is completely straight but horizontal. You can draw a right triangle angle between the radius and tangent line by adding a third line, and a right angle is 90 degrees. So, this forms a perpendicular line.
Hope this helped :))