Answer:
0.0138888888889 or
1/72
Step-by-step explanation: The answer can be found in Desmos
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
First we use product rule
y=x^2lnx
dy/dx = x^2 d/dx (lnx) + lnx d/dx (x^2)
dy/dx = x^2 (1/x) + lnx (2x)
dy/dx = x + 2xlnx
now taking second derivative:
d2y/dx2 = 1 + 2[x (1/x) + lnx (1)]
d2y/dx2 = 1 + 2[1+lnx]
1+2+2lnx
3+2lnx is the answer
Answer:
- 4
Step-by-step explanation:
(2*(Rationalize(9.7)-Rationalize(4.8x)))==Rationalize(61.2)-Rationalize(3.4)
Rationalize(18.4)-Rationalize(2.8x)
==Rationalize(57.8)
-Rationalize(2.8x)==Rationalize(57.8)-Rationalize(18.4)
x= 38.4÷-2.8
:x= -4
Answer:
8963.46
Step-by-step explanation:
84*66 for the rectangle and since there is two semi circles you could just calculate it as one so it would be 84*66+33*33*3.14 because formula for area of circle is A= pi*raduis with exponant of 2