Answer:
Carrying capacity is defined a the ability of the natural ecosystem to take care of the environment which does not necessarily cause the resistance in population increase.
Explanation:
The earth indeed has a mechanism of delivering changes to the system and keeping it intact but as the case of the rapid growth of population arises the mother nature sees this as an exponent of unsustainable growth as the resource used to sustain large populations is no longer available or are exhausted.
A population increase so does the carrying capacity and workload of the natural environment which at the time gets slow due either due to the man's artificial technology or the natural process like hurricane or earthquake itself.
But seeing the nature as providing possibilities for the existence of the societies throughout ages and hence trying to maintain its originality may break those activities that it considers resistance as several biotic factors like predators, disease, competition, and lack of food.
There are several different processes, including glycolysis and the Calvin Cycle, but the umbrella term for getting energy from glucose is cellular respiration.
Answer:
Transgenic animals require a host to grow but transgenic bacteria and plants do not require host.
Explanation:
Transgenic organisms are the organisms in which foreign genetic material are introduced so that the transgenic organism can get some particular traits and characteristic.
The process of producing transgenic animals is different from producing transgenic plant and transgenic animals because in transgenic animals DNA from a cell is transferred into an enucleated oocyte.
Then this oocyte is transferred to the oviduct of a surrogate mother to raise the genetically modifies embryo but in plant and microbe, no host is required.
The Answer is Studs.
Vertical structural
members are called Studs. This is the term which is used in construction. There
are exterior and interior walls which are framed, these walls are known as
bearing walls, and some are also non- bearing. Whenever there is foundation in
a place, after the first floor deck these bearing walls are formed.
<span> </span>