4/3 = 1/x.....4 lbs potatoes to $3 = 1 lb of potatoes to $x
cross multiply
(4)(x) = (3)(1)
4x = 3
x = 3/4
x = 0.75....so 1 lb of potatoes cost 75 cents
(8,6)...this means 8 lbs of potatoes cost $6
Answer: About
Step-by-step explanation:
The missing figure is attached.
Notice in the first picture that Alberta has a complex shape.
You can calculate the area of a complex shape by decomposing it into polygons whose areas can be calculated easily.
Observe the second picture. Notice that it can be descompose into two polygons: A trapezoid and a rectangle.
The area of the trapezoid can be calcualted with the formula:

Where "h" is the height, "B" is the long base and "b" is short base.
And the area of the rectangle can be found with the formula:

Wkere "l" is the lenght and "w" is the width.
Then, the apprximate area of Alberta is:

Substituting vallues, you get:

Therefore, the area of of Alberta is about
.
Answer:
13 1/2
Step-by-step explanation:
Just multiply 3.5 and 4.75
AKA
3 1/2 and 4 3/4
Change 1/2 into 2/4 so the denominators are the same
Multiply the numerators 2 and 3, you now have 6/4
3 × 4 = 12
6/4 is improper so, you need to simplify
now you have 1 1/2
Now 12 + 1 1/2 = 13 1/12
If you have an angle and want to know its complement, you subtract it from 90 degrees. What angle, when subtracted from 90 degrees, gives the same value?
90 - x = x
The supplement of x is the angle that you add to x to make 180 degrees. In other words, 180 - x = the supplement of x.
Answer:
Step-by-step explanation:
In costing analysis, direct materials, labour and direct expenses aggregate to prime cost. Alternately, the aggregate of indirect materials, labour and expenses is termed as overhead. Overheads are classified into fixed and variable.
Variable overhead is one which varies directly as per number of units produced
Variable overhead rate variance = actual costs -(AHxSR)
= Actual costs - (Actual hours x std rate)
= Actual hours x actual rate - actual hours x std rate
Hence option D is right.