Answer:
(1,-1)
(7,12)
(5,-3)
Step-by-step explanation:
we know that
If a ordered pair is a solution of the inequality, then the ordered pair must satisfy the inequality
we have

Verify each case
case 1) we have
(1,-1)
substitute the value of x and the value of y in the inequality and then compare the results

----> is true
therefore
The ordered pair is a solution of the inequality
case 2) we have
(7,12)
substitute the value of x and the value of y in the inequality and then compare the results

----> is true
therefore
The ordered pair is a solution of the inequality
case 3) we have
(-6,-3)
substitute the value of x and the value of y in the inequality and then compare the results

----> is not true
therefore
The ordered pair is not a solution of the inequality
case 4) we have
(0,-2)
substitute the value of x and the value of y in the inequality and then compare the results

----> is not true
therefore
The ordered pair is not a solution of the inequality
case 5) we have
(5,-3)
substitute the value of x and the value of y in the inequality and then compare the results

----> is true
therefore
The ordered pair is a solution of the inequality
Answer:
It would be 5
Step-by-step explanation:
5 equals everything that is 5 or 10
for example, 5 * 5 equals 25
Odd numbers times 5 equals a odd number with the 5 at the end
Even numbers times 5 equal an even number with a 0 at the end
I hope that helped
answer:
Contd.
Explanation:
We will use the following well-known
Result : The eqn. of a line l passing through the pt. of
intersection of the lines l1:a1+b1+c1=0andl2:a2x+b2y+c2=0 is of
the form
Result :
Answer:
0.55 = 55% probability that the construction job will be completed on time
Step-by-step explanation:
We have these following probabilities:
0.6 probability there is a strike. In this case, 0.35 probability that the construction will be completed on time.
1 - 0.6 = 0.4 probability that is not a strike. In this case, 0.85 probability that the construction will be completed on time.
What is the probability that the construction job will be completed on time?

0.55 = 55% probability that the construction job will be completed on time