Answer:
Step-by-step explanation:
The time is inversely related to the number of people working so that as the number of people working increases, the time required decreases
t = k p
divide both sides by p
t/p =k
Ft2 (squared) hope it helps
Answer:
x = 1/3
General Formulas and Concepts:
<u>Pre-Algebra</u>
- Order of Operations: BPEMDAS
- Equality Properties
Step-by-step explanation:
<u>Step 1: Define equation</u>
4x + 1 = 3 - 2x
<u>Step 2: Solve for </u><em><u>x</u></em>
- Add 2x on both sides: 6x + 1 = 3
- Subtract 1 on both sides: 6x = 2
- Divide 6 on both sides: x = 1/3
<u>Step 3: Check</u>
<em>Plug in x to verify it's a solution.</em>
- Substitute: 4(1/3) + 1 = 3 - 2(1/3)
- Multiply: 4/3 + 1 = 3 - 2/3
- Add/Subtract: 7/3 = 7/3
Here we see that 7/3 does indeed equal 7/3.
∴ x = 1/3 is a solution of the equation.
3(x+2)+11>20
minus 11 both sides
3(x+2)>9
divide both sides by 3
x+2>3
minus 2 both sides
x>1