Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
The <em>correct answer</em> is:
A) A tangent is never a secant.
Explanation:
A tangent is a line that touches a circle in exactly one point. A secant is a line that touches a circle in two different points.
Since a tangent only touches once and a secant touches twice, there is no way a tangent can be a secant.
Answer:
45°
Step-by-step explanation:
<em>complem</em><em>entary</em><em> </em><em>angl</em><em>es</em><em> </em><em>add</em><em> </em><em>up</em><em> </em><em>to</em><em> </em><em>9</em><em>0</em><em>°</em><em> </em><em>so</em><em> </em><em>it's </em><em>9</em><em>0</em><em>-</em><em>4</em><em>5</em>
Answer:
Step-by-step explanation:
1.09 for donuts(x) and 1.59 for cinnamon bagels(y) and 1.59 for onion bagels(z)
1.09x + 1.59y + 1.59z <== ur expression
A = 1/2 x bh
A = 1/2 x 5 x 12
A = 6 x 5
A = 30m