The cost of hiring a car for 2 days in 2013 is Rs. 316.8
<h3>How to find the cost of hiring in 2013 ?</h3>
The cost for hiring a car for 2 days in 2018 was Rs. 264 which was 20% more than in 2013.
Therefore,
cost of hiring for 2018 = Rs. 264
Therefore,
let
cost of hiring in 2013 = 20%(264) + 264
cost of hiring in 2013 = 20 / 100 × 264 + 264
cost of hiring in 2013 = 1 / 5 × 264 + 264
cost of hiring in 2013 = 264 / 5 + 264
cost of hiring in 2013 = 52.8 + 264
cost of hiring in 2013 = 316.8
Therefore, the cost of hiring a car for 2 days in 2013 is Rs. 316.8.
learn more on cost here: brainly.com/question/1663590
#SPJ1
Answer:
The greatest number of 15 inches pieces that can be cut from 5 rolls of length 9 feet is: 35
Step-by-step explanation:
Given
Total length of one roll of ribbon = 9 feet
As the pieces have to be cut into inches, we will convert the measurement in feet to inches
As there are 12 inches in one feet, 9 feet will be equal to:
9*12 = 108 inches
Now first of all, we have to see how many 15 inches pieces can be cut from one role
So,

So the seamstress can cut 7 15-inch long pieces from a roll.
Now given that he has to cut from 5 rolls, the total number of 15-inch pieces will be:

Hence,
The greatest number of 15 inches pieces that can be cut from 5 rolls of length 9 feet is: 35
Answer:
x=2
Step-by-step explanation:
0=-2x+4
add -2x on both sides
2x=4
divide by 2
x=2
To write the function correctly, it is important to assign variables correctly and understand the situation of the problem clearly. For this, we let y the number of people and x as the number of songs played.
At x = 0 y = 567
at x = 1 y = 567 - 567(1/3)
at x = 2 y = 567 - 567(1/3)(1/3)
at x = 3 y = 567 - 567(1/3)(1/3)(1/3)
Therefore, the number of people left after x songs would be represented by the equation:
y = 567 - 567(1/3)x
y = 567 ( 1- x/3 )
1) 4 divided by 7 = 0.57
2) 4 times 5 = 20 and 4 times 8 = 32
3) 20 plus 32 = 52
4) 0.57 times 52 = 29.64
5) answer : 29.64
i hope this is correct. i tried to break it down.