Answer:
e) z (max) = 24
x₁ = x₂ = 0 x₃ = 4
Step-by-step explanation:
a) The problem requires maximizing the total value from sandwich fruits and drink, therefore the objective function is associated to the sum of the values of each value.
We have three variables xi ( x₁, x₂, x₃ ) the values of sandwich, fruits and drink, and we have to maximize such quantities subject to the constraint of size (the capacity of the basket)
b) z = 6*x₁ + 4*x₂ + 6*x₃ Objective Function
Constraint :
basket capacity 17
9*x₁ + 3*x₂ + 4*x₃ ≤ 17
General constraints:
x₁ ≥ 0 x₂ ≥ 0 x₃ ≥ 0 all integers
e) z (max) = 24
x₁ = x₂ = 0 x₃ = 4
NOTE: Without the information about fractional or decimal feasible solution we decided to use integers solution
The answer would be B(3.25)
i hope this helps!
We are tasked to solved for the length of the ramp having an inclination of 15 degrees with the ground and 10 feet from the end of the ramp to the base of the building of the ground. Using trigonometric properties, we have a formula given an angle and the its opposite sides which is,
sin(Angle)=opposite/hypothenuse
hypothenuse would be the distance or the length of the ramp.
so we have,
sin(15)=10/hypothenuse
Cross-multiply, we have,
hypothenuse=10/sin(15)
using scientific calculator having a DEG mode,
hypothenuse=38.63703
Rounding of in nearest tenth we get,
hypothenuse=38.6 ft
Therefore, the ramp is 38.6 ft long
Based on the scenario, the initial temperature would be :
28 = (60) (1/2)^x/30 + 20
(60) (1/2)^0/30 + 20 = 60 + 20 =
80 C
Hope this helps
Answer:
3 inches up per foot across
Step-by-step explanation:
The rate of change:
( y2 - y1 ) / (x2 - x1) = ( 18 in - 12 in ) / ( 6 ft - 4 ft ) =
= 6 in / 2 ft = 3 in / 1 ft