Answer:
--6+36m
Step-by-step explanation:
This is the concept of proportionality, we are required to calculate for the number of hours two crews can use to paint the house altogether.
Here proceed as follows;
number of hours new crew can paint=12 hrs
portion of work painted by new crew in 1 hour= 1/12
number of hours experienced crew can paint=6 hours
Portion of work painted by experienced crew in 1 hour=1/6
Portion of work painted by the two crews altogether in 1 hour will be:
1/6+1/12=1/4
thus the total amount of hours that the two painters will take to paint will be:
4 hours
Answer:
x = 7
Step-by-step explanation:
-3 + 2x = 11
(group like terms)
2x = 11 + 3
2x = 14
(divide both sides by 2 to make x stand alone)
2x/2 = 14/2
x = 7
Answer:
12m²
Step-by-step explanation:
For a rectangle, with length L and width W,
the perimeter is given as
Perimeter,
P = (2 x Length) + (2 x Width)
P = 2L + 2W
It is given that the perimeter is 48, hence
48 = 2L + 2W (divide both sides by 2)
24 = L + W
or
L = 24 - W -----> eq 1
Also realize that the Area of a Rectangle is given by
A = L x W -----> eq 2
Substituting eq 1 into eq 2,
A = (24 - W) x W
A = -W² + 24W
Recall that for a quadratic equation y = ax² + bx + c, the maxima or minima is given by y(max) = -b/2a
In this case, b = 24 and a = -1
-b/2a = -24/[ 2(-1) ] = 12
Hence for A to be maximum A(max) = 12m² (Answer)
The answer is the third one aka C.
There must not be two points on the same y-axis because that doesn't make a function but a relation instead.
C. doesn't have 2 points on same y-axis and therefore the third picture is the relation that's a function.