The answer is 2/52 or if you want a rounded up answer it is 1/26
The answer is 200 because you multiply 20x12 you get 200
Answer:
Total cost is $205328
Step-by-step explanation:
Given data:
cost C(q) = 0.1 q^3 - 0.5 q^2 + 500 q + 200
current units q = 4 ( 4000 units )
The current level of production is 4000 ( 4 )units, and manufacturer is planning to upgrade this to 4100 ( 4.1 ) units
C'(q) = 3 * 0.1 q^2 - 2 * 0.5 q + 500
C'(q) = 0.3 q2 - q + 500
C(4.1) - C(4) ≈ C’(4) x Δq
≈ C’(4) x 0.1
≈ ( 0.3 * 4^2 - 4 + 500 ) x 0.1
≈ ( 0.3 * 16 - 4 + 500 ) x 0.1
≈ 500.8 x 0.1 ≈ 50.08
total cost = 4100 x 50.08 = $205328
9514 1404 393
Answer:
see below
Step-by-step explanation:
The y-coordinates of the points are the same, so the distance between those points will be the difference of the x-coordinates. The first number line shows those x-coordinates plotted properly. It can be used to find the difference between them.
The answer would be B. -2 < x < 2 because if you look at the graph, the range would be left and right. So, the farthest to the left would be -2 and the farthest to the right would be 2.
It wouldn't be all real numbers.
<em>Hope this helps! - from peachimin</em>