Answer:
It takes 32 Minutes for 12 people to paint 12 walls
Step-by-step explanation:
If it takes 8 people 32 minutes to paint 8 walls, then that means each person takes 32 minutes to paint 1 wall. With that being said, If you have 12 people painting 12 walls, It will take 32 minutes for all 12 walls to be painted.
Hope this helps!
Answer:
Removing the perfect square 4 in 12 we get 2√3
Step-by-step explanation:
The square root of 12 is
√12 = √(4 x 3)
√12 = 2√3.
There's no special trick here, but it's usually easy to check whether a small number is divisible by 4. Keep this in mind when looking for factors.
Removing the perfect square 4 in the square root of 12 we get 2√3.
Here 4 is a perfect square it can be written as
√4 =√2^2
√4 =2
Answer:
B=-36
Step-by-step explanation:
First, do 6(8), which equals 48
The you subtract 48 from both sides, which leaves you with:
-36=B
Answer:
10
Step-by-step explanation:
you do 90 divided by 20 and get 4.5 so you take away 40 and leftover with 10
for every member to get a shirt you would need to order 9 packages of shirt (because 5 times 9 is 45) and for caps the minimum to order would be 15 packages of caps
explanation
caps=3 per package
shirts=5 per package
divide 45 by and get 15
15 is the total packages of hats needed to order
for shirt 45 divided by 5 is 9
9 is the total packages of shirts needed to order