Answer:
35 is the length of BE
Step-by-step explanation:
2(2x + 5) = 8x - 50
4x + 10 = 8x -50
10+50 = 8x-4x
60= 4x
15 = x
2x + 5 = length of BE equal to length of DE
2(15) +5 = BE
30 +5
35 is the length of BE
Answer:
150.796π square meters
maybe!
Step-by-step explanation:
Answer:
5.6
Step-by-step explanation:
2.4 / 3 = x / 7
2.4 x 7 = 16.8
16.8 ÷ 3 = 5.6
Answer:
The standard deviation of number of hours worked per week for these workers is 3.91.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.
In this problem we have that:
The average number of hours worked per week is 43.4, so
.
Suppose 12% of these workers work more than 48 hours. Based on this percentage, what is the standard deviation of number of hours worked per week for these workers.
This means that the Z score of
has a pvalue of 0.88. This is Z between 1.17 and 1.18. So we use
.





The standard deviation of number of hours worked per week for these workers is 3.91.