1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Svet_ta [14]
4 years ago
11

A typical container of orange juice concentrate holds 12 fluids ounces (fl oz). The standard recipe is "Mix one can of concentra

te with three cans of cold water".
Olivia has one gallon container to fill with orange juice. She uses the standard recipe. How much concentrate does she need? (One gallon 128 fl oz)
Mathematics
1 answer:
dangina [55]4 years ago
7 0
The\ standard\ recipe\ is:\\\ 12\ fl\ oz\of\ orange\ juice\ concentrate\\ and\ 3\cdot 12=36\ fl\ oz\ of cold\ water\\so\ is\ 12+36=48\ fl\ oz\ of\ mix\\\\128:48=2 \frac{2}{3} \\\\Ans.\ Olivia\ need\ \ 2 \frac{2}{3}\ cans\ of\ orange\ juice\ concentrate.
You might be interested in
Are 7 and 42 relatively prime
Iteru [2.4K]
7 is a prime number, 72 is not a prime number.
Hope this helped!:)

8 0
3 years ago
Find the ordinary interest on $ 1,800 for two months at a rate of 12%
balandron [24]
<span>Divide 12% by 12 months to get 1% per month. Multiply by 2 months to get 2%. Multiply 1800 by 0.02 </span>
5 0
3 years ago
What is 20.6 divided by 9.7? (Include remainder)
andre [41]
20.6 divided by 9.7 is 2.12371134
5 0
4 years ago
A manufacturer of skis produces two types: downhill and cross country. The times required for manufacturing and finishing each s
pogonyaev

Answer:

So to maximize profit 24 downhill and 20 cross country shouldbe produced

Step-by-step explanation:

Let X be the number of downhill skis and Y the number of cross country skis.

Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours

Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.

Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90

total finishing time taken = 0.5x+1.5 y≤42

Profit function

Z = 50x+50y

Objective is to maximize Z

Solving the two equations we get intersecting point is

(x,y) = (24,20)

In the feasible region corner points are (0.28) (36,0)

Profit for these points are

i) 2200 for (24,20)

ii) 1400 for (0,28)

iii) 1800 for (36,0)

So to maximize profit 24 downhill and 20 cross country shouldbe produced.

6 0
3 years ago
There are 48 heads and 134 legs how many sheep is there​
alukav5142 [94]

Answer:

48

Step-by-step explanation:

48 heads =48sheep. .i guess. .......

8 0
3 years ago
Read 2 more answers
Other questions:
  • Val and tony get paid per project. Val is paid a project fee of $44 plus $12 per hour. Tony is paid a project fee of $35 plus $1
    7·1 answer
  • The ratio of surface areas of two similar solids is equal to the square of the
    8·2 answers
  • Assignment
    6·1 answer
  • What is the smallest positive number that can be added to 55 so that the resulting number and 45 have 9 as their greatest common
    14·1 answer
  • Chad has a rope that is 20 yards long. How many pieces of rope measuring 4/7 of a yard can he divide his rope into?
    15·2 answers
  • (b) A ball is dropped from a height 30m above the ground and rebounds to ¾ of previous height continuously until it stops. Find
    5·1 answer
  • Out of the 21 students in mrs Clark’s class by 3/7 of the class are boys
    7·2 answers
  • REWARDING BRAINLY TO CORRECT ANSWER
    9·2 answers
  • Find the slope y-intercept of each line. Write the equation of the line please help
    15·1 answer
  • Fill in the blanks with two consecutive integers to complete the following inequality.
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!