It seems that you have missed the necessary options for this question, but anyway, the correct answer for this would be PRESENT VALUE. The current value of a future sum of money is called a present value. Hope this is the answer that you are looking for. Have a great day!
Answer:
AND
Explanation:
AND condition is used when we need to check for the condition in which both the given conditions are satisfied.
Here from the statements provided in the question, it can be observed that the vendor must have offices in both the cities i.e the condition should be followed that the vendor has the office in one city AND the other city.
Answer:
Predetermined manufacturing overhead rate= $2.15 per direct labor hour
Explanation:
Giving the following information:
It takes 80,900 direct labor hours to manufacture the X-1 and 93,500 direct labor hours to manufacture the X-2 Line.
Total overhead= 225,000 + 149,960= $374,960
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 374,960 / (80,900 + 93,500)
Predetermined manufacturing overhead rate= $2.15 per direct labor hour
Answer:
Dissimilar mental model
Explanation:
Communication is simply the interaction with two or more people. It is the passing of information. It involves the transfer and understanding of meaning. In communication, members of the organization shows their satisfaction and frustrations.
mental models simply represent a described or support comprehension as it keep info about the current situation available in memory. It guide behavior and allow prediction.
Answer:
Beta distribution
Explanation:
Beta distribution In probability theory
is regarded as a part of continuous probability distributions with a defined interval which could be 0 and 1, and it is characterized with two positive parameters (α and β) which is seen as
as exponents of the random variable .
It should be noted that Beta distribution probability is commonly used to model the inherent variability of activity time estimates in project management