Answer:
Step-by-step explanation:
Translation 3 left and up 6 adds (-3, 6) to each coordinate pair.
(x, y) ⇒ (x -3, y +6)
A(-1, 2) ⇒ A'(-1 -3, 2 +6) = A'(-4, 8)
B(1, 5) ⇒ B'(1 -3, 5 +6) = B'(-2, 11)
0.5x+5.17: 10.00
hope it still helps
A= 168 minutes or 2 hours and 48 minutes.
B= 3 tyres
Zane climb up in 33 seconds
44•33 = 1452 m.
so, Zane start from 1313 + 1452 = 2765 m below the edge.
to reach the edge with constant speed, Zane need 2765/44 = 62.84 seconds
we can round it to 63 seconds
6.324
hope i helped you!!