The answe is 'B', as it should contain all the required information on how to operate the device, as well as a troubleshooting guide.
Answer:
5
Explanation:
2⁵ = 32, so that fits.
In general, to calculate the number of bits without guessing, you can take the 2 log of the number and then round up:

rounded up gives 5.
difference between engineering and architecture are.
A engineer is a person whose job involves designing and building engines, machines, roads, bridges ,etc .
While architect design buildings only.
Implementation hiding i<u>s the encapsulation of method details within a class</u>. Implementation can be interpreted as those specifications which can be altered without altering the correctness of an application. Wrapping data/methods within classes (descriptions of the way all objects of this type will look/act) in combination with implementation hiding is called encapsulation. Information users need to know about behaviors should be available without dependence on implementation specifications.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.