Assuming that all energy of the small ball is transferred
to the bigger ball upon impact, then we can say that:
Potential Energy of the small ball = Kinetic Energy of
the bigger ball
Potential Energy = mass * gravity * height
Since the small ball start at 45 cm, then the height
covered during the swinging movement is only:
height = 50 cm – 45 cm = 5 cm = 0.05 m
Calculating for Potential Energy, PE:
PE = 2 kg * 9.8 m / s^2 * 0.05 m = 0.98 J
Therefore, maximum kinetic energy of the bigger ball is:
<span>Max KE = PE = 0.98 J</span>
Answer:
It is important to be able to separate mixtures to obtain a desired component from the mixture and to be able to better understand how each component.
Explanation:
amount of work done is 5880 J
Given:
mass of object = 50kg
Final height = 20m
initial height = 8m
To Find:
amount of work done
Solution:
work is done when a force acts upon an object to cause a displacement. You can calculate the energy transferred, or work done, by multiplying the force by the distance moved in the direction of the force.
The work done by gravity is given by the formula,
W = mgh
W = 50 x 9.8 x ( 20-8)
= 5880 J
So the work done is 5880 J
Learn more about Work done here:
brainly.com/question/25239010
#SPJ4
The heat remains constant because there’s nothing to cool it down
<h2>
Answer: 540 J</h2>
Explanation:
The Work
done by a Force
refers to the release of potential energy from a body that is moved by the application of that force to overcome a resistance along a path.
Now, when the applied force is constant and the direction of the force and the direction of the movement are parallel, the equation to calculate it is:
(1)
In this case both (the force and the distance in the path) are parallel (this means they are in the same direction), so the work
performed is the product of the force exerted to push the box
by the distance traveled
.
Hence:
(2)