Answer:
300 gallons an hour
Step-by-step explanation:
If it pumps 75 gallons in 1/4 of an hour (15 minutes), then if you times that by four to make it a full hour (60 minutes). 75 times 4 is 300.
Answer:
$1.4 B per year
Step-by-step explanation:
Answer:
see below
Step-by-step explanation:
Every vertex moves twice as far from the center of dilation as it is in the pre-image.
Perhaps the easiest image point to find is the one at lower left. In the pre-image it is 2 units left of the center of dilation, so the image point will be 2×2 = 4 units left of the center of dilation. It will be located at (-6, -2).
Other points on the image can be found either by reference to the center of dilation, or by reference to known image points. For example, the next point clockwise is 1 left and 4 up in the pre-image, so will be 2 left and 8 up from (-6, -2) in the image. That is, the pre-image point (-5, 2) becomes image point (-8, 6). You will note that (-5, 2) is 3 left and 4 up from the center of dilation, and that (-8, 6) is 6 left and 8 up from the center of dilation (twice as far away).
The slope of the line is 7/4
Answer:
The remainder is: 3x+3
The quotient is: 1
Step-by-step explanation:
We need to divide
(3x^2 + 9x + 7) by (x+2)
The remainder is: 3x+3
The quotient is: 1
The solution is attached in the figure below.