Answer:
97.8%
Step-by-step explanation:
110 is 2 standard deviations above the mean (6+6 = 12)
12+98 = 110
Looking at the standard deviation curve
P(x< or = to 110) = 1 - P(x>110)
We can find the probability that x>100 by adding anything above 2 standard deviations above the curve.
P(x>110) = 2.1+.1 = 2.2%
P(x< or = to 110) = 1 - P(x>110)
= 1- 2.2%
= 1- .022
= .978
= 97.8 %
Answer:
<u>At a constant speed of 0.5 miles per minute, the ostrich can run 20 miles in 40 minutes. The unit rate is 0.5 miles per minute.</u>
Step-by-step explanation:
Distance run by the ostrich = 6 miles
Time the ostrich takes to run this distance = 12 minutes
Speed of the ostrich = Distance / Time
Speed of the ostrich = 6 miles / 12 minutes = 0.5 miles per minute
How far the ostrich could run in 40 minutes?
If the ostrich run 0.5 miles per minute, this is the formula:
Speed of the ostrich * 40 minutes = Distance
0.5 miles/minute * 40 minutes = 20 miles (Minutes is simplified in the numerator and the denominator on the left side)
<u>At a constant speed of 0.5 miles per minute, the ostrich can run 20 miles in 40 minutes. The unit rate is 0.5 miles per minute.</u>
Answer:
pretty sure its the first and 3rd one sorry if im wrong
Step-by-step explanation:
Answer: medium 18. Range 6 ,25th percentile 17 , 75th percentile 20 ,IQR 3
Step-by-step explanation from the given figure, median is equal to 18, the range is equal to 21-15 equal to 6. The 25th percentile is equal to17 while the 75th is equal to 20. IQR then is equal to 20-17 equal to 3.
Answer:
r=d/t
r=360 cm / 9 sec= 40 cm per second