Answer:
80.8
Step-by-step explanation: 0.7x4x6=16.8
16.8+8 to the 2nd power= 80.8
Answer:
5
Step-by-step explanation:
Productivity: My candy bar company made 100 million bars last year, sold for $1 each. I also paid [L] people last year, with an average salary of $100K last year. I have overhead cost of $10M. What was my TOTAL productivity (no units, rounded to 2 decimal places)?
Solution:
Total productivity is the average of labour and capital productivity weighted and adjusted to price fluctuations. It is the ratio of total output to the total input. The total productivity is given by the formula:
Total productivity = total output / total input
Total output = Revenue = number of bars sold * price per bar
Total output = 100 million * $1 = $100 million
Total input = Total salary + overhead cost
Total salary = number of people * average salary = 100 *$100000 = $10 million
overhead cost = $10 million
Total input = $10 million + $10 million = $20 million
Total productivity = total output / total input = $100 million / $20 million
Total productivity = 5
it's 45
Step-by-step explanation:
Okay, so if 2 peppers is 25 meters long, you just divide 25 by 2 to get how many peppers the dragon breathes as 1 pepper. So then you get 12.5, And if you do that with the green peppers, you get 1.5. So, the dragon ate 3 green peppers, so it's 12.5 x 3 , aka. 12.5+12.5+12.5. That's 37.5, and if you do 1.5x5 for the green peppers, it's 7.5, And now you add 37.5+7.5, and you get 45.
Answer:
10 and 7x + 1
Step-by-step explanation:
The area of a rectangle is 70x + 10.
Let's factor 70x + 10.
Factor out a common factor of 10.
70x + 10 = 10(7x + 1)
Since the area of a rectangle is length * width, we can let one factor be the length and the other factor be the width.
Possible dimensions are 10 and 7x + 1
Answer:
(4.25, - 1.75)
Step-by-step explanation:
Under a reflection in the y- axis
a point (x, y ) → (- x, y ), thus
(- 4.25, - 1.75 ) → (4.25, - 1.75 ) ← original point