Answer:
36 minutes
Step-by-step explanation:
10blocks in 6mins
20blocks in 12mins
30blocks in 18mins
40blocks in 24mins
50blocks in 30mins
60blocks in 36mins
Answer:
dssds 8900
Step-by-step explanation:
dwdwdmunayaynd
1 + sec^2(x)sin^2(x) = sec^2(x)
This becomes
1+tan^2(x) = sec^2(x) which is an identity
You could
1 + sin^2(x)/cos^2(x) = sec^2(x)
then
cos^2(x) + sin^2(x) = cos^2(x)sec^2(x)
1 = 1
Answer:
production cost f(x), in dollars, for x number of units produced by company 1:
f(x) = 0.05x^2 − 7x + 300
2) Table that represents the production cost g(x), in dollars, for x number of units produced by company 2:
x g(x)
0.6 899.58
0.8 899.52
1 899.50
1.2 899.52
1.4 899.58
3) Comparison: do a table for f(x) with the same x-values of the table for g(x).
x f(x) = 0.05x^2 − 7x + 300 g(x)
0.6 295.818 899.58
0.8 294.432 899.52
1 293.05 899.50
1.2 291.672 899.52
1.4 290.298 899.58
As you can see the values of f(x) are consistently lower than the values of g(x) for the same x-values.
The minimum production cost for company 2 is around 899.50 at x = 1, while the minimum production cost of company 1 is defintely lower (lower than 292.298 for sure, in fact if you find the vertex it is 55).
Answer: Based on the given information, the minimum production cost for company 2 is greater.
Step-by-step explanation:
Answer:
-36
Step-by-step explanation:
Express it in an equation:
6+(x/9)=2
-6 -6
x/9=-4
-36