Answer:
Ann would need 3 h to complete the remainder of the Job.
Step-by-step explanation:
Step 1.
The "speed" that each girl has to do the work is determined as:
- Tina:
, it means that Tina complete one twelveth of the job each hour. - Ann:
, it means the Ann completes one eighth of the job each hour.
Step 2.
The amount of work done by Tina in 9 hours, is obtain multiplying by the "speed" calculated in step 1:
Amount of work done=
. It means that <em>Tina completes two thirds of the work in 9 h.</em>
Step 3.
The remaining job is calculated as
. It means that <em>still remains is one third of the job to be completed</em>.
Step 4.
The time required for Ann to complete the job is calculated dividing the remaining of the job by the "speed" of Ann to do the job.
. It means that <em>Ann would complete the job in another 3 hours</em>.
Answer:
A, B
Step-by-step explanation:
After being simplified and put in standard form, the equations are ...
A. 3x² +8x -13 = 0 . . . a quadratic
B. 3x² -x -30 = 0 . . . . a quadratic
C. 4x = -16 . . . . . . . . . a linear equation, not quadratic
D. 3x⁴ -5x -6 = 0 . . . . a quartic equation, not quadratic
Both of the quadratic equations can be solved using the quadratic formula.
Answer:
60 units
Step-by-step explanation:
Ratio of the perimeter = ratio of sides
Sides are in the ratio:
6 : 24
1 : 4
Perimeter of the first triangle:
4+5+6 = 15
Perimeter of the second triangle:
4(15) = 60
Found the figure:TU = 7TS = x - 1Since T is equidistant from u and s, this means that TU = TS7 = x - 17 + 1 = x8 = xThe ...
It is 4 I believe sorry if I’m wrong