Answer:
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway. So first step:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Step-by-step explanation:
Mark me brainliest!
Answer: -6.7
Step-by-step explanation:
64.3−(3)(23)−2
=−6.7