11

Jessica and Matthew work for different companies. Jessica has a base salary of $36,000 and will receive an increase of salary at

a rate of 3.1% per year. Matthew has a base salary of $38,000 and will receive an increase of salary at 2.5% per year.
Mathematics
2 answers:
fomenos4 years ago
5 0

Answer:

Step-by-step explanation:

Can you explain Im on that question now?

Kruka [31]4 years ago
4 0
What do you want us to solve
You might be interested in
How do I use the cosine rule for these problems?
Elenna [48]

Answer:

see explanation

Step-by-step explanation:

Using the Cosine rule

a² = b² + c² - 2abcosA ← Rearranging for cosA gives

cosA = \frac{b^2+c^2-a^2}{2ab}

(a)

let a = 10, b = 7, c = 8 and A = α, then

cosα = \frac{7^2+8^2-10^2}{2(7)(8)} = \frac{49+64-100}{112} = \frac{13}{112}, thus

α = cos^{-1}( \frac{13}{112} ) ≈ 83° ( to the nearest degree )

(b)

let the angle opposite side 7 be x

Using the Sine rule

\frac{10}{sin83} = \frac{7}{sinx} ( cross- multiply )

10sinx = 7sin83 ( divide both sides by 10 )

sinx = \frac{7sin83}{10} , thus

x = sin^{-1} ( \frac{7sin83}{10} ) = 44°

The third angle can be found using the sum of angles in a triangle

third angle = 180° - (83 + 44)° = 180° - 127° = 53°

The 3 angles are 83°, 44°, 53°

6 0
3 years ago
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
The height of a plant, y, in centimeters, is measured x weeks after planting a seed. The height can be modeled by the regression
Gnoma [55]

Answer:

D. The limiting value for the height of the plant is 6.88 cm.

Step-by-step explanation:

5 0
3 years ago
Hepppppp Aspppppppppppp
TiliK225 [7]

Answer:

19

Step-by-step explanation:

If t = 7

Then 5 + 2t would be equal to

5 + (2*7)

5 + 14

19

4 0
4 years ago
Read 2 more answers
Barbara worked 30 hours last week. She
schepotkina [342]

Answer:approximately  a little more than 32 hours

Step-by-step explanation:

422/30  =  455/x

422x  =  30*455

422x = 13,650

x=32.345971

4 0
4 years ago
Other questions:
  • PLEASE HELLP Eric plays basketball and volleyball for a total of 95 minutes every day. He plays basketball for 25 minutes longer
    10·1 answer
  • Two numbers are in a ratio of 4:3 thekr sum is 63 find the bigger number
    8·1 answer
  • hal says that the greatest product of a three digit number and a one digit number is 8,891. is he correct???????????????????????
    10·1 answer
  • What's is the mouse
    10·1 answer
  • What is the slope?
    11·1 answer
  • WILL MARK BRAINLIEST!!! Please solve the whole page with work!! It will be very much appreciated and I will heart the correct co
    11·1 answer
  • 48 oz. for $3.99<br>36 oz. for $2.59<br>12 oz. for $1.99<br>which is the best deal<br>​
    15·2 answers
  • I don’t really know math so...
    15·1 answer
  • WILL GIVE BRAINLEST!!!!!!!!!!!!!! ANSWER ASAP!!!!!!!!!!!!
    14·1 answer
  • Help with hw please I’ll give brainliest
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!