IF the estimates are 100% accurate, then the maximum volume of concrete is the product of the maximum dimensions, namely
Vmax=18.32*12.22*0.55=123.13 m^3
and the minimum volume of concrete is the product of the minimum dimensions
Vmin=18.28*12.18*0.45=100.19 m^3
the uncertainty is therefore 123.13-100.19=22.94 m^3
On the practical side, to this uncertainty must be added to
- squareness of the formwork
- evenness of the surface of the crushed stones on which the foundation sits on
- excess of concrete delivered by the truck
- volume of air bubbles trapped in the the concrete, ...
3/4 is bigger kosh if you draw it out it would be clear to you
You must do 20×26=520
⬇
4 workes times 5 days
Total is 520
Hope I helped !!!!!