Answer:
A) total distance covered = 60miles
B) total time taken = 4hrs 30 mins
Step-by-step explanation:
Detailed explanation and calculation is shown in the image below
Answer:
13.) 314.2 in²
15.) 181.5 ft²
Step-by-step explanation:
The area of a circle is found using the equation:
A = πr²
In this equation, "π" represents the number pi (3.14....) and "r" represents the radius (half the diameter).
For 13.), you have been given the radius. Thus, you can substitute it into the equation and solve for "A".
A = πr²
A = π(10)²
A = π x (100)
A = 314.2 in²
For 15.), you have been given the diameter. To find the radius, you need to divide this value by 2. Once you find the radius, you can plug it into the equation and simplify like above.
diameter = 15.2 ft
radius = 7.6 ft
A = πr²
A = π(7.6)²
A = π x (57.76)
A = 181.5 ft²
<span>The median would be preferred over the mean in such scenarios because the median will lessen the impact of the outliers that fall within the "tail" of the skew. Therefore, if a curve is normally distributed, that is to say that data is normally distributed, there will be two tails, each with approximately equal proportions of outliers. Outliers in this case being more extreme numbers, and are based on your determination depending on how you are using the data. If data is skewed there is one tail, and therefore it may be an inaccurate measure of central tendency if you use the mean of the numbers. Thinking of this visually. In positively skewed data where there is a "tail" towards the right and a "peak" towards the left, the median will be placed more in the "peak", whereas the mean will be placed more towards the "tail", making it a poorer measure of central tendency, or the center of the data.</span>
Answer:
8710 units
Step-by-step explanation:
<em>Step 1: Write all the data</em>
Fixed cost: $9000
Average variable cost: 9.3 per unit
Total cost: 90,000
Total units: x
<em>Step 2: Find the total variable cost</em>
Average variable cost is per unit so it has to be multiplied by the number of units to find the total variable cost.
Total variable cost = average variable cost per unit x number of units
Total variable cost = 9.3x
<em>Step 3: Make the formula for finding x</em>
Total cost = total fixed cost + total variable cost
90,000 = 9000 + 9.3x
81000 = 9.3x
x = 8709.67
Rounded off to 8710 units
!!