Answer: data loss protection
Explanation:
In any organization or enterprise it is very essential to provide protection from data loss to avoid breaches by unauthorized accesses and to secure the data irrespective of whether it is in rest or motion.
It is known that data changes its form when it is copied, moved and stored in different memory location so in this process a lot of sensitive data might be exposed to the outside world and left into the hands of the unauthorized for easy of access to it.
So once a security breach is possible through the system or into the network of the organization it would expose all the application database, emails, spreadsheets and the personal workstation files. So in such a scenario the importance of data loss protection is highlighted and must be given due importance.
It is usually .doc but if you use notepad, (the free version of Word) it's .docx
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer: Detailed
Explanation:
SDLC consist of 7 phases. They are:
1. Planning.
2. System analysis and requirement
3. Design:
4. Coding:
5. Testing:
6. Installation
7. Maintenance
Here we are talking of the third phase. In this phase it is the design phase which consist of high and low level design. Here the preliminary design is included in high level design where it describes the required hardware, software, network capabilities and the modelling of the interface. However the detailed design in low level design will implement the coding and will finding of any errors in the implemented design as described by the preliminary design.
Answer:By specifying conditions, you can create custom filters that narrow down the data in the exact way that you want. You do this by building a filter. If you've ever queried data in a database, this will look familiar to you. Point to either Number Filters or Text Filters in the list.
Explanation: