1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Korvikt [17]
3 years ago
9

Always refill your gas tank well before____.

Computers and Technology
2 answers:
yan [13]3 years ago
6 0

Answer:

D. your fuel gauge reaches one-quarter full

Explanation:

Always refill your gas tank well before your fuel gauge reaches one-quarter full.

It would be dangerous to do this after and it could start a fire and cause injuries.

mash [69]3 years ago
4 0

Aloha~. My name is Zalgo and I am here to be of assistance with your problem. The answer to your question is D. The minimum amount of gas you can leave in your vehicle is 1/4 Full or 3/4 Empty. The most amount you will need is quite close to when your gas tank is full (so 1/4 Empty or 3/4 Full).

Hope this helps.

"Stay Brainly and stay proud!" - Zalgo

You might be interested in
Which code snippet is the correct way to rewrite this in Semantic HTML?
xxMikexx [17]

Answer:

<div id="header">

<h1>Waketech</h1>

</div>

<header><h1>Waketech</h1></header>

Explanation:

I think thats the answer your welcome

8 0
1 year ago
Many of the internal OS services are provided by the ___________ module, which contains the most important operating system proc
patriot [66]

Answer:

Kernal module

Explanation:

Modules are pieces of code that can be loaded and unloaded into the kernel upon demand. They extend the functionality of the kernel without the need to reboot the system.

6 0
4 years ago
Estimate how many searches will be needed to justify time spent on presorting an array of 101 elements if sorting is done by mer
sertanlavr [38]

Answer:

Merge sort is sort, which contains the same elements in the array to maintain original positions concerning each other. Complexity of sort is O (nLogn) and runtime is O(nlogn)

Explanation:

Estimate time spent on presorting an array 101 element in merge and binary search, two schemes can be used in the first scheme if 101 items in sequential search then use the complexity of O(n). In the second scheme covert, the list into an array then sort an array with the complexity of O(n log n) and fetch the 101 elements.

Merge 101 elements; presorted sub-array n items have to compare the top times in sub-array and choose the maximum item and place it in a sorted array. Time for merging is proportional to ( k-1) n.

Suppose the processing time of the merger is c.(k-1) .n then scale factor has the same value.

The processing time of a sorting array is a recurrence equation.

T(n) = 3T (n/3) + 2 cn

Similarly this implement for array of 105 element.

5 0
4 years ago
Scientists measure an object’s mass in kilograms and its weight in newtons. If you knowthe amount of mass of an object in kilogr
Phoenix [80]

Answer:

public class WeightCalculator {

   

   private static DecimalFormat df2 = new DecimalFormat("#.##");

   

   public static void main(String args[]){

       //create scanner to receive user input

       Scanner in = new Scanner(System.in);

       //alert user to input mass

       System.out. println("Enter the Mass in Kg");

       //collect the input as a string

       String s = in. nextLine();

       //convert string to double and multiply by 9.8

       Double weight = Double.valueOf(s)* 9.8;

       

       //Print out answer formatted to 2 decimal place

       System.out. println("The Weight is " + df2.format(weight) + "N");

       

       //conditional statement to check if weight is less than 100

       if (weight < 100){

           System.out. println("Oops, it is too light");

       }

       //conditional statement to check if weight is more than 500

       if (weight > 500){

           System.out. println("Oops, it is too heavy");

       }            

   }

}

7 0
4 years ago
Which of the following is NOT a project management cause of failed projects? (Points : 2) Shortcuts taken during the project
muminat

Answer:

Inadequate analysis of system and the design

Explanation:

Some of the causes of failed project in project management are as follows:

  • Deficient hazard the executives.
  • Inadequately characterized task scope.  
  • Inability to recognize key presumptions.  
  • Undertaking administrators who need involvement and preparing.
  • Absence of powerful correspondence at all levels.
  • No utilization of formal techniques and procedures.  
  • Overrun of the budget

8 0
4 years ago
Other questions:
  • Please check my answer! (Java)
    8·1 answer
  • Which components can be added to a lightning app on custom object (choose 3 answers)A. Visualforce B. Standard Lightning compone
    6·1 answer
  • What is your favourite video game??​
    5·2 answers
  • Alexandria works for a non-profit company that asks for donations to help the homeless people in her community. Recently the dat
    12·1 answer
  • Match the items with their respective descriptions. organizes files make files easily searchable keeps track of file creation an
    14·1 answer
  • Random integer between 3 and 13 (inclusive)
    8·2 answers
  • It's usually easier to change the design of a photo album slide show A.after you've created the presentation. B.before you've cr
    15·1 answer
  • What are the purposes of using a text-to-speech tool? Check all that apply.
    9·2 answers
  • What is the best resource to learn python?
    14·2 answers
  • Assume you have written a method with the header num yourMethod(string name, num code). The method's type is ____ .
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!