1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
inna [77]
3 years ago
7

5.78,-5 7/8,5.6 least to greatest

Mathematics
1 answer:
Romashka-Z-Leto [24]3 years ago
3 0
Least to greatest: -5 7/8, 5.6, 5.78
You might be interested in
A triangle has sides with lengths of 26 meters, 39 meters, and 43 meters. Is it a right triangle?
Ivanshal [37]

Answer: No

Step-by-step explanation:

This triangle is not a right triangle because:

A right triangle must have one side that is exactly 90°.

A triangle with sides 26, 39, and 43 do not have any sides that total 90.

The answer to your question is no.

Best of Luck!

4 0
3 years ago
Read 2 more answers
Which of the following are polynomials?
zubka84 [21]
Answer is b hope this helps
6 0
4 years ago
F(x) = a(x - p)3(x - g)2?
ivanzaharov [21]

Answer:

fx=ax-ap+6x-6g is the simplified answer

Step-by-step explanation:

f(x)= a(x-p) 3(x-g) 2

fx= ax-ap+ (3x-3g)2

fx= ax-ap+ 6x-6g

5 0
4 years ago
Find the equation of the line specified. The line passes through the points ( 7, -7) and ( 6, -5)
dolphi86 [110]
Simple...

you have: (7,-7) and (6,-5)

Using \frac{ y_{1}-  y_{2} }{ x_{1}-  x_{2} } to find slope--->>>

\frac{-7--5}{7-6} = \frac{-2}{1}

=-2

m=-2

Using y=mx+b to find the equation of the line-->>(Use any of the coordinates)

(7,-7)

-7=-2(7)+b

-7=-14+b

-7=-14+b
+14  +14

7=b

y=-2x+7

Thus, your answer.
6 0
4 years ago
The time required to complete a project is normally distributed with a mean of 80 weeks and a standard deviation of 10 weeks. Th
matrenka [14]

Answer: the due date would be 92 weeks

Step-by-step explanation:

Since the time required to complete a project is normally distributed, we would apply the formula for normal distribution which is expressed as

z = (x - µ)/σ

Where

x = number of weeks.

µ = mean

σ = standard deviation

From the information given,

µ = 80 weeks

σ = 10 weeks

If a construction company bidding on this contract wishes to be 90 percent sure of finishing by the due date, the z score corresponding to 90%(90/100 = 0.9) is 1.29

Therefore,

1.29 = (x - 80)/10

x - 80 = 1.2 × 10

x - 80 = 12

x = 80 + 12 = 92

5 0
3 years ago
Other questions:
  • How many feet are in 30 yd?
    14·2 answers
  • How do you simplify this?
    5·1 answer
  • You have $40 in a savings account and you deposit an equal amount into your account each week. after 8 weeks the account holds $
    6·1 answer
  • A rectangular swimming pool measures 30 meters by 50 meters. Tope swims back and forth the complete length of the pool parallel
    11·1 answer
  • The difference of 2 and 3 times the number p
    9·1 answer
  • Kristy spent 4 hours at the gym last week. if 5 over 6 of the time was spent jogging, how much time did she spend jogging?
    6·1 answer
  • Find missing angles x = <br> degrees
    5·2 answers
  • (2x+7x2+x)+(2x-4x-12)
    14·1 answer
  • Please help meeeeeeeeeeeeeeeee please
    7·1 answer
  • SOMEONE PLEASE HELP ME WITH THIS!!<br> IMAGE DOWN BELOW!!<br> ILL GIVE YOU BRAINLIST ANSWER!!
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!