Answer:
The correct answer is B. If there are 10 plants producing the total domestic consumption of a product and each plant is operating at minimum efficient scale, then each plant accounts for 10 percent of domestic consumption.
Explanation:
It is understood that the total consumption of a product is 100% of it. Therefore, as long as there are 10 plants that, producing at a minimum efficiency scale on an equal basis, cover this total consumption, the percentage of consumption that each plant produces will be 10%.
This is so because 100/10 = 10, provided that it is considered that the production is carried out equitably between each of the production plants.
Your answer would be "Peril"
Answer:
Instructions are listed below.
Explanation:
Giving the following information:
Estimated manufacturing overhead $75,000
Direct labor hours incurred 4,800
Direct labor hours estimated 5,000
A) Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= 75,000/5,000= $15 per direct labor hour
B) Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 15*4,800= $72,000
The description explained depicts urban renewal.
Urban renewal were the policies that were out in place to enable housing authorities and local governments to demolish the neighborhoods that were considered to be blighted and poor and then replace such neighborhoods with real estate that were more valuable and were usually reserved for the white people.
Houses that were seen to be slums were destroyed and newer and fascinating neighborhood were constructed.
In conclusion, the correct option is C "urban renewal".
Read related link on:
brainly.com/question/12979681
Answer:
500 + 0.40q
Explanation:
A publisher prints copies of a popular weekly tabloid for distribution and sale.
Given that,
Fixed costs = $500 per print run
Variable cost = $0.40
Therefore, the cost function is as follows:
Let the number of copies printed be q,
Cost function: C(q) = Fixed cost + Variable cost
= 500 + (0.40 × q)
= 500 + 0.40q