Answer:
<em>When manufacturing overhead costs are assigned to production in a process cost system, it means that the business uses absorption costing system.</em>
Explanation:
When manufacturing overhead costs are assigned to production in a process cost system, it means that the business uses absorption costing system.
Absorption costing system is that where units of products and inventories are valued using full cost. Full cost implies that each product would be charged for an amount of the<em> fixed production overhead </em>in addition to the variable cost.
The fixed overhead is charged using a predetermined overhead absorption rate.
Answer:
C. as the supply for milk increases, the price of milk will also increase
Answer:
Applet's flexible budget variance for total costs is $5,140 unfavorable variance since actual is higher than budgeted cost
Explanation:
Flexible budget variance for total costs=actual total costs-budgeted total costs of 72 connectors
actual total costs of 72 connectors=$19,000
budgeted total costs of 72 connectors=budgeted fixed cost+budgeted total variable cost of 72 connectors
total budgeted variable cost=72*$130=$ 9,360.00
budgeted fixed cost is $4,500
Budgeted total costs of 72 connectors=$9,360.00+$4,500.00=$ 13,860.00
Flexible budget variance =$ 13,860.00-$19,000.00=$5140 unfavorable variance
I think it would be better if you provided some options to choose. But I think, I know the answer. I think it's one of practice innovative strategies.
Answer:
0.259
Explanation:
difference in loan loss allowance in the year= 4.5-4.2= 0.3m
difference in non performing loans in the year= 6.2-5.8= 0.4m
Provision for loan loss= (difference in loan loss allowance + difference in non performing loans)/ net charge offs
provision for loan loss= (0.3+0.4)/2.7=0.259