first we must calculate the expected future value of the engine overhaul:
($390 x 10%) + ($570 x 30%) + ($750 x 50%) + ($790 x 10%) = $39 + $171 + $375 + $79 = $664
now we must determine the present value of $664 using a 6% interest rate:
PV = FV / (1 + r)⁶ = $664 / 1.06⁶ = $468.09
Answer:
graph B
Step-by-step explanation:
the interval between the two runs is short compare to graph A
Answer:
n = -36
Step-by-step explanation:
The answer is -36 because:
1) We first have to subtract -24 and 12 to find n
-24 - 12 = -36
This is because whenever there are two negative signs, multiply it.
Negative x Negative = Positive
We have to do, 24 + 12 which is 36. Finally, we just put the greater number's sign to the answer. 24 is greater than 12, therefore, we put a negative sign before 36.
Hope this helps!
11 5/6 as a decimal would be 11.83. Then, rounding that to the nearest whole number would be 12. Giving you an answer of 12.
Answer: x = 1
Step-by-step explanation:
2log(x+1) - log (x+3) = log 1
log(x+1)^2 - log (x+3) = log 1
log [(x+1)^2 / (x+3)] = log 1
(x+1)^2 / (x+3) = 0
(x+1)^2 = 0
x = 1 or x = -1 (rejected, as log0 does not exist)