Answer:
y = 3/4x + 7
Step-by-step explanation:
Put it in point-slope form:
y - 4 = 3/4(x - -4)
y - 4 = 3/4(x + 4)
y - 4 =3/4x + 3
y = 3/4x + 7
C. a and c, b and d
mdmcnfnfn
Answer:
4/3
Step-by-step explanation:
Sounds as though this problem presented several rates of change, but you have shared only one: 3y - 4x = 3. If we take x to be the independent variable, then 3y = 4x + 3, and y = (4/3)x + 1. The rate of change of this function (the rate of change of y with respect to x) is therefore 4/3.
Answer:
95% provides more information
Step-by-step explanation:
The confidence interval is obtained by using the relation :
Xbar ± Zcritical * σ/√n
(Xbar - (Zcritical * σ/√n)) = 5.22 - - - (1)
(Xbar + (Zcritical * σ/√n)) = 5.98 - - (2)
Adding (1) and (2)
2xbar = 5.22 + 5.98
2xbar = 11.2
xbar = 11.2 / 2 = 5.6
Margin of Error :
Xbar - lower C.I = Zcritical * σ/√n
Zcritical at 90% = 1.645
5.6 - 5.22 = 1.645 * (σ/√n)
0.38 = 1.645 * (σ/√n)
(σ/√n) = 0.38 / 1.645 = 0.231
Therefore, using the se parameters to construct at 95%
Zcritical at 95% = 1.96
Margin of Error = Zcritical * σ/√n
Margin of Error = 1.96 * 0.231 = 0.45276
C.I = xbar ± margin of error
C. I = 5.6 ± 0.45276
C.I = (5.6 - 0.45276) ; (5.6 + 0.45276)
C. I = (5.147 ; 6.053)
Hence, 95% confidence interval provides more information as it is wider.
= (3 * 1.25 * 2)/(0.25) ^ 3
= 7.5/(1/64)
= 480 boxes
Good luck :)