1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
horsena [70]
3 years ago
14

Where were some of the first tunnels built

Mathematics
1 answer:
QveST [7]3 years ago
6 0
<span>In Babylonia, tunnels were used extensively for irrigation; and a brick-lined pedestrian passage some 3,000 feet (900 meters) long was built about 2180 to 2160 BC under the Euphrates River to connect the royal palace with the temple. Hopefully this answer helps
</span>
You might be interested in
On a test, you earn 92% of the possible points by correctly answering 6 five-point questions and 8 two-point questions. How many
olya-2409 [2.1K]

Step-by-step explanation:

(6×5)+(8×2)=46

92℅=46points

100℅=x

criss cross

<u>92℅x=46</u>

<u>9</u><u>2</u><u>℅</u><u>.</u><u> </u> 92℅

and this is the answer

8 0
3 years ago
Read 2 more answers
The three methods used to classify costs into their fixed and variable components includes:_____.
Allushta [10]

Answer:

a. high-low method.

b. scatter diagrams.

d. least-squares regression.

Step-by-step explanation:

Costing is a measurement of the cost of production of goods and services by assessing the fixed costs and variable costs associated with each step of production.

Fixed cost can be defined as predetermined expenses in a business that remain constant for a specific period of time regardless of the quantity of production or level of outputs. Some examples of fixed costs in business are loan payments, employee salary, depreciation, rent, insurance, lease, utilities etc.

On the other hand, variable costs can be defined as expenses that are not constant and as such usually change directly and are proportional to various changes in business activities. Some examples of variable costs are taxes, direct labor, sales commissions, raw materials, operational expenses etc.

In Financial accounting, the three methods used to classify costs into their fixed and variable components includes high-low method, scatter diagrams and least-squares regression.

The high-low method is a quick and easy way to estimate costs by using historical accounting information from a range of reporting periods.

A scatter diagram (scattergraph) estimate costs by considering all the data points and not just the lowest or highest point.

A least squares regression line is a standard technique in regression analysis used to make the vertical distance obtained from the data points running to the regression line to become very minimal or as small as possible.

Generally, the sum of the residuals of a least squares regression line is always equal to zero.

4 0
3 years ago
Read 2 more answers
Help please zjyjytbrbbrbrb
Viktor [21]

.                                                                                                                                     .

     

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

3 0
2 years ago
Pleaseee helppppppp!!!!!!!!!
larisa [96]

Answer:

angle 1 + angle 2 = 100

angle 1 = 40

angle 2 = 60

angle 3 = 120

Step-by-step explanation:

5 0
3 years ago
M∠COX = m∠AOX + m∠<br><br> Answers:<br> COD<br> COE<br> COX<br> COA
postnew [5]

Answer:

ok

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
Other questions:
  • A math problem that equals 8?
    7·2 answers
  • How to solve this with working out please.
    10·2 answers
  • ???????????????????????????
    13·1 answer
  • What addition sentence does this show?
    9·1 answer
  • Olivia is brewing tea. She starts boiling 0.455 L of water in a kettle. The change in volume of the contents of the kettle are n
    11·1 answer
  • Answer this please I’ll give brainlest if you answer it correctly!
    13·2 answers
  • 0.009 ÷ 0.08 please help me I forgot how to divide decimals
    5·1 answer
  • The shaded shape is a square. What are the coordinates of A and B?
    15·1 answer
  • The sum of two integers is 67 the larger is 23 less than twice the smaller find the two integers
    11·1 answer
  • Pls help me im not that smart !!
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!