Based on the time it took the patient to recover and the mean and standard deviation, the z-score is 1.5.
<h3>What is the z-score?</h3>
The z-score for this patient who takes 7 days to recover can be found as:
= (Time taken to recover - Mean) / Standard deviation
Solving for the z-score gives:
= (7 - 5.2) / 1.2
= 1.8 / 1.2
= 1.5
The first part of the question is:
The patient recovery time from a particular surgical procedure is normally distributed with a mean of 5.2 days and a standard deviation of 1.2 days.
Find out more on the z-score at brainly.com/question/25638875
#SPJ4
Answer: 22 minutes
Step-by-step explanation: 500-170 means that he drained 330 gallons of water so 330 divided by 15 gallons a minute so you get 22 so it takes 22 minutes to have 170 gallons left in the pool
Um, we see that the slice created the triangle, and the formula to find the area of the triangle:
1/2×B×h where B represent Base and h represent height.
In this case, Base=5 cm
Height=11 cm
A=1/2×11×5
A=5.5×5
A=27.5 square cm. As a result, the area of the resulting two-dimensional cross section is 27.5 square cm. Hope it help!
Answer:
c=(10)($1.75)/12
c=$17.50/12
c=$1.458 which rounds to $1.46 per token