Hi, to answer this question we have to write an equation:
The cost (y) must be equal to the product of the cost per hour of installation (20) and the number of hours that it takes (x); plus the fixed cost of parts and installation (75).
Mathematically speaking:
y = 20x+75
Feel free to ask for more if needed or if you did not understand something