For any given y value, there can only be one x value. Let's consider a graph with a line that curves and intersects x=2 twice. This would mean that if you plug 2 into the function you would get two answers. However, this is not possible as plugging in any value to x will result in only one answer. For example, if y= 4x + 3, no matter how many times I plug a number in there, I'm always going to get the same y value, and this is true for all real functions.
Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Answer:
Step-by-step explanation:
(5,4) ; (-3, -2)

(5,4) & m = (3/4)
y -y1 = m(x-x1)
y - 4 = (3/4)(x - 5)

Answer:
A = 4200 ft^2
Step-by-step explanation:
We know the formula for area is
A = l*w
We need to have the same units
convert yd to ft
1 yd = 3ft
Multiply each by 70
70 yds = 210 ft
A = 210 *20
A = 4200 ft^2