Answer: Jenny would have to work 5 hours to get $85
Step-by-step explanation:
Jenny makes $17 an hour (221/13 = 17) and 85/17 is 5
Answer:
There is no specific linear equation for this scenario because there is only one possible length for the pole.
Step-by-step explanation:
The value of x in the equation is 26.7
<h3>How to solve an equation?</h3>
0.75x + 1.5y = 40
−1.5x − 1.5y = −60
add both equation to eliminate y .
Therefore,
−1.5x + 0.75x = -0.75x
1.5y + (- 1.5y) = 0
40 + (-60) = -20
Hence,
-0.75x = - 20
divide both sides by -0.75
-0.75x / -0/75 = - 20 / -0.75
x = - 20 / -0.75
x = 26.6666666667
x = 26.7
learn more on equation here: brainly.com/question/7234676
#SPJ1
Answer:
C) 0.19
Step-by-step explanation:
A correlation coefficient is a measure of how well the line of best fit fits the data. The higher the correlation coefficient, up to 1.0 or -1.0, the better the fit. A positive correlation coefficient means an increasing data set, while a negative correlation coefficient means a decreasing data set.
We can see that this line of best fit is increasing, so our correlation coefficient will be positive.
However we can also see that the points are fairly scattered; this means this is not a very good fit. This means that 0.19 is the better fit.
When we are to divide the line segment such that the ratio is 1:2, there are actually 3 parts of the segment. First, we determine the distance between the coordinates and divide the distance by 3. Then, we add the quotient to the x-coordinate.
x-coordinate: (2 - 9) / 3 = -7/3
y-coordinate: (6 - 3 ) / 3 = 1
Adding them to the coordinates of a,
x - coordinate: (9 - 7/3) = 20/3
y - coordinate: (3 + 1) = 4
Thus, the coordinates are (20/3, 4).