Please answer this question now in two minutes

Mathematics
1 answer:
KonstantinChe [14]3 years ago
5 0

Answer:

c. Not enough information

You might be interested in
Select the correct answer from each drop-down menu. the equation from the graphed line in slope-point form using the point 2,-1
Arada [10]
The formula for point-slope form is y-a=m(x-c), where y and x are variables, a is simply one point in y, m is the slope, and c is simply one point in x. The first thing we can find is m, or the slope. This is found by dividing the change in y over the change in x. The equation for this is (I’ll plug the points in the equation)
\frac{y_{2}-y_{1}}{x_{2}-x_{1}} = \frac{y_{1}-y_{2}}{x_{1}-x_{2}} =  \frac{-1-(-2)}{2-(-2)}=  \frac{-1+2}{2+2} =1/4

Therefore, our answer is the bottom one as our slope is 1/4.

Feel free to ask further questions!
5 0
3 years ago
Read 2 more answers
1. The radius equals<br> units<br> 2. The diameter equals<br> units
Lelu [443]

Answer:

radius = 4units

diameter = 8units

Step-by-step explanation:

The radius is the distance from the midpoint of a circle to any point on the side of the circle. In this case, the radius is, 4units. The diameter is twice the radius and is 8 units.

8 0
3 years ago
1. 12 + -8= cómo l resuelvo?
Ksenya-84 [330]

Answer:

4

Step-by-step explanation:

12−8

=12+−8

=4

4 0
3 years ago
I need answers 1-4. i don’t understand how to figure out the answers
klasskru [66]

answersssssssssssssss to ?


8 0
3 years ago
Two companies working together can clear a parcel of land in 27 hours. Working alone, it would take Company a 2 hours longer to
algol13

Answer:

53 hours

Step-by-step explanation:

If A is the time it takes Company A, and B is the time it takes Company B, then:

1/27 = 1/A + 1/B

A = B + 2

Substitute and solve:

1/27 = 1/(B + 2) + 1/B

1/27 = (B + B + 2) / (B (B + 2))

1/27 = (2B + 2) / (B² + 2B)

27 (2B + 2) = B² + 2B

54B + 54 = B² + 2B

0 = B² − 52B − 54

B = [ -(-52) ± √((-52)² − 4(1)(-54)) ] / 2(1)

B = (52 ± √2920) / 2

B ≈ 53.0

It would take Company B approximately 53 hours.

5 0
3 years ago
Other questions:
  • What is the equivalent decimal for 67/100,1/100,81/1000,9 6/10, 3 21/100,5 3/100, 4 77/1000
    12·2 answers
  • Secant DH and tangent DE intersect at point D. Chord EJ and chord GH intersect at point K. Find the values of x and y. If necess
    11·1 answer
  • A projectile is fired with initial speedv -100 feet per second from a height of h 0 feet atan angle of θ-7/6 above the horizonta
    10·1 answer
  • I need help on this question.
    7·1 answer
  • Need help with this question thanks!
    9·1 answer
  • A farmer harvested 21 1/4 fewer bushels of sweet corn this year than the previous year. If the farmer's sweet corn crop is plant
    5·1 answer
  • Write the slope intercept form of the equation of the line through the given point plz
    15·2 answers
  • What is the quotient of 10 divided by 3/5?
    7·1 answer
  • Can anyone help me please? no links im finna cry
    11·1 answer
  • PLEASE HELPPPPPPPPPPPP
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!