kobusy [5.1K]
3 years ago
7

What is the y-intercept of the line given by the equation below? ( Y=4x-6 )

Mathematics
1 answer:
kaheart [24]3 years ago
7 0
D. (-6,0) because according to y=mx+c, c is the y intercept and in this case when x=0, y=-6 using the given equation
You might be interested in
Find all maxima and minima of the function given below. Use a horizontal span of -6 to 6. (Round your answers to two decimal pla
AVprozaik [17]
Equation: 4 + 4x + x²

Maxima: No maximum value from said equation
Minima: x = -2 since that is the only critical point in the equation
6 0
3 years ago
Which of the following expressions has the greatest value?
zimovet [89]
I believe the answer is B: 3 + 7 + (-10).
4 0
3 years ago
Read 2 more answers
Can you please help me i will give brainly to yall if u answer please help me please go through all the images
Angelina_Jolie [31]

Answer:

her inequality is incorrect

the number of hours is greater than or equal to 6

(not sure about the first two questions cause the question is kinda confusing. just know that the inequality in the question represents "x is less than or equal to 6")

their number line is incorrect

the number line is correctly filled in

the lien should be shaded to the left

6 0
2 years ago
What is the area of the figure
Musya8 [376]

Answer:

Divide it into two sqaures. The are btw is 108

Step-by-step explanation:

8 0
3 years ago
The expected activity time in PERT analysis is calculated as: the weighted average of a, m, and b, with m weighted 4 times as he
maria [59]

Answer:

\text{the weighted average of a, m, and b, with m weighted 4 times as heavily as a and b.}

Step-by-step explanation:

\text{The expected activity time in PERT analysis is calculated as:}

\mathbf{\dfrac{a+4m + b}{6}}

where;

\text{a = optimistic duration; }

\text{m = most likely duration and;}

\text{ b = pessimistic duration     from the above formula.}

3 0
2 years ago
Other questions:
  • Lucinda is a cross-country ski racer. On Saturday, she skied twice as many miles as she did on Sunday. Over the weekend she skie
    14·1 answer
  • Please do questions 31-34 I need them ASAP in 2h
    9·2 answers
  • What is the square root of 64
    11·2 answers
  • 5 Select the correct answer. Michael had $550 in his savings account. He took out $30.75 every month for one year. What is the n
    12·1 answer
  • The difference between a number and 12 is 20
    9·1 answer
  • Please be correct!!!!!!!
    9·1 answer
  • Use the given sequence to answer this following questions:
    9·1 answer
  • Select the correct answer.
    14·2 answers
  • In which quadrant does the point (-6,4) lie?
    14·1 answer
  • (PLS HELP)<br> Choices:<br> A. 120cm<br> B. 117cm<br> C. 101cm<br> D. 350cm
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!