b. protozoa
One of the four species of protozoan in the genus Plasmodium is responsible for the acute or subacute infectious disease known as malaria.
<h3>A virus or a bacteria causes malaria?</h3>
- A virus or bacteria cannot cause malaria.
- Plasmodium, a parasite that often spreads through infected mosquitoes, is what causes malaria.
- A mosquito consumes Plasmodia that are present in blood when it feeds on an infected human.
<h3>How do protozoa cause malaria?</h3>
- The female anopheles mosquito bite is the primary method of transmission of malaria, a protozoan infection of the red blood cells.
- The Plasmodium genus of protozoa is what causes malaria.
- Four different types of malaria parasites can infect people: Plasmodium malariae, vivax, ovale, and falciparum
learn more about malaria here
brainly.com/question/2685790
#SPJ4
A Venus flytrap produces new leaves from the step tip. <span>The life characteristic that this illustrates is A. Growth. </span><span>Venus Flytraps are composed only of leaves, and rather than sharing a root system, each leaf grows its own root or roots, and each root is a single structure, not dividing or </span>
Answer:
Concentration gradient
Explanation:
Concentration gradient of the ions across the membrane generates the membrane resting potential.
Concentration gradient means that there is unequal distribution of the ions on different sides of membrane. For example, the concentration of K ions is much higher within the cell then out of the cell. Opposite is with the Na ions. When ions move from the area of their higher concentration to the are with the lower concentration, we say they move down the gradient or diffuse (no energy required). On the other hand, movement of ions against their gradient means that this process requires energy and involves protein pumps.
Blueberry: 1st Trophic Level
Rabbit: 2nd Trophic Level
Snake: 3rd Trophic Level
Cat: 4th Trophic Level
Hope this helps :P
plz give me the brainliest if it does : )
A is the answer
Training programs for animal control officers usually take from a few weeks to a few months to complete.